![]() |
Banner Scroller
|
|
|||||||
| Register | FAQ | Members List | Calendar | Search | Today's Posts | Mark Forums Read |
| Pictures A Place to Show Off Your Work, Toys, and Hobbies. |
![]() |
|
|
Thread Tools | Search this Thread | Display Modes |
|
#21
|
||||
|
||||
|
Looking great. Nice work on all the inlay cutting.
__________________
~Adam _______________________________________________ "A rising tide raises all ships." Website (Desperately needed update coming soon!) Company Facebook & 3D Portfolio |
|
#22
|
||||
|
||||
|
Paver inlays do look killer. Ever since I saw GM's house last year, I love your inlay work. To be honest, before I started coming here I would put in a circle kit here and there or an ocassional double border, but I find myself doing more inlays myself now. Thanks for the inspiration.
__________________
Joe ICPI Certified NCMA Certified Cambridge Pro Certified Contractor www.imagastonelanddesign.com |
|
#23
|
|||
|
|||
|
The inlays look nice, but they can be a major PITA. This entire patio (roughly 800 sf or less) took 6 days to lay, and about 1/2 of it has yet to be poly sanded. It seemed like it took forever to lay; part of it was due to access- everything had to come in from one spot, part of it was due to not being able to complete 100% of the base work before the pavers went down. Every inlay we did was banded with the Stonehenge, which required 2 cuts- and there was no room for error on the second cut.
Yeah, they look cool, but they eat up a LOT of time. The main reason we did so much was because Mark bought a bunch of pavers CHEAP last fall, and we are trying to use them up. Didn't have enough of any one color/style to do the whole patio!
__________________
Forever a Hoosier flatlander |
|
#24
|
|||
|
|||
|
Cheap bastard! LOL Looks great
|
|
#25
|
|||
|
|||
|
Updated with pics from today. I just realized that those are the only pictures I took this week, but the last wall had 2-3 courses extended and then capped earlier in the week, and the seat wall was finished as well.
Tuesday we poly-sanded the remainder of the pavers. I shut off the hose literally as the rain started falling. Fortunately we had tarps/plastic already out (had it covered the night before) and got them pulled over the pavers. The big tarp isn't exactly waterproof any more, so I was worried about the poly washing out and "hazing" the pavers. I pulled the tarps off Wednesday morning but couldn't tell if the poly had washed out (the sand stayed in the joints) because the pavers were still wet. I was quite happy to get there today to find that everything was OK.
__________________
Forever a Hoosier flatlander |
|
#26
|
||||
|
||||
|
the patio between the walls.... Is it one of the rain pave brick? If so what was your drainage field like?
__________________
Christmas specialists! www.davisons4seasons.com "where only mother nature can do it better" What have you done to better your marriage today? |
|
#27
|
|||
|
|||
|
Yes, the pavers in front of the basement door are permeable. For the application and the site, there's 12" of 3/4" clean stone with a thin layer of 3/8" stone on top for a setting bed. Everything on this site is sand, had conditions been different we likely would have used more stone.
__________________
Forever a Hoosier flatlander |
|
#28
|
|||
|
|||
|
Updated again. Not much left do on this project.
I suspect the fire pit is being used as I type this.
__________________
Forever a Hoosier flatlander |
|
#29
|
|||
|
|||
|
Mark posted a finished picture of the fire pit today, as well as the granite counter top being set.
There's just a bit of cleanup work left on this one and we're done. As soon as we get a machine running again we can get that little bit finished.
__________________
Forever a Hoosier flatlander |
![]() |
| Thread Tools | Search this Thread |
| Display Modes | |
|
|