ProHardscaper.com
Banner Scroller

Go Back   ProHardscaper.com > The Supply Yard > Pictures
Register FAQ Members List Calendar Search Today's Posts Mark Forums Read

Pictures A Place to Show Off Your Work, Toys, and Hobbies.

Reply
 
Thread Tools Search this Thread Display Modes
  #21  
Old 07-10-2010, 01:38 PM
MuirView Landscape's Avatar
MuirView Landscape MuirView Landscape is offline
Super Moderator
 
Join Date: Nov 2007
Location: Amish Country, PA
Posts: 2,400
Default

Looking great. Nice work on all the inlay cutting.
__________________
~Adam
_______________________________________________
"A rising tide raises all ships."

Website
(Desperately needed update coming soon!)
Company Facebook & 3D Portfolio
Reply With Quote
  #22  
Old 07-10-2010, 05:06 PM
joeymaze's Avatar
joeymaze joeymaze is offline
 
Join Date: Nov 2008
Location: Frankfort, NY
Posts: 737
Default

Paver inlays do look killer. Ever since I saw GM's house last year, I love your inlay work. To be honest, before I started coming here I would put in a circle kit here and there or an ocassional double border, but I find myself doing more inlays myself now. Thanks for the inspiration.
__________________
Joe

ICPI Certified
NCMA Certified
Cambridge Pro Certified Contractor
www.imagastonelanddesign.com
Reply With Quote
  #23  
Old 07-10-2010, 07:58 PM
danf danf is offline
 
Join Date: Apr 2009
Location: Moultonville/Center Ossipee, NH
Posts: 511
Default

The inlays look nice, but they can be a major PITA. This entire patio (roughly 800 sf or less) took 6 days to lay, and about 1/2 of it has yet to be poly sanded. It seemed like it took forever to lay; part of it was due to access- everything had to come in from one spot, part of it was due to not being able to complete 100% of the base work before the pavers went down. Every inlay we did was banded with the Stonehenge, which required 2 cuts- and there was no room for error on the second cut.

Yeah, they look cool, but they eat up a LOT of time. The main reason we did so much was because Mark bought a bunch of pavers CHEAP last fall, and we are trying to use them up. Didn't have enough of any one color/style to do the whole patio!
__________________
Forever a Hoosier flatlander
Reply With Quote
  #24  
Old 07-12-2010, 08:54 AM
cgland cgland is offline
 
Join Date: Apr 2009
Posts: 389
Default

Cheap bastard! LOL Looks great
Reply With Quote
  #25  
Old 07-16-2010, 08:27 PM
danf danf is offline
 
Join Date: Apr 2009
Location: Moultonville/Center Ossipee, NH
Posts: 511
Default

Updated with pics from today. I just realized that those are the only pictures I took this week, but the last wall had 2-3 courses extended and then capped earlier in the week, and the seat wall was finished as well.

Tuesday we poly-sanded the remainder of the pavers. I shut off the hose literally as the rain started falling. Fortunately we had tarps/plastic already out (had it covered the night before) and got them pulled over the pavers. The big tarp isn't exactly waterproof any more, so I was worried about the poly washing out and "hazing" the pavers. I pulled the tarps off Wednesday morning but couldn't tell if the poly had washed out (the sand stayed in the joints) because the pavers were still wet. I was quite happy to get there today to find that everything was OK.
__________________
Forever a Hoosier flatlander
Reply With Quote
  #26  
Old 07-19-2010, 04:20 PM
4seasons's Avatar
4seasons 4seasons is offline
 
Join Date: Feb 2008
Location: millersburg, berlin ohio
Posts: 389
Default

the patio between the walls.... Is it one of the rain pave brick? If so what was your drainage field like?
__________________
Christmas specialists!
www.davisons4seasons.com

"where only mother nature can do it better"


What have you done to better your marriage today?
Reply With Quote
  #27  
Old 07-19-2010, 08:01 PM
danf danf is offline
 
Join Date: Apr 2009
Location: Moultonville/Center Ossipee, NH
Posts: 511
Default

Yes, the pavers in front of the basement door are permeable. For the application and the site, there's 12" of 3/4" clean stone with a thin layer of 3/8" stone on top for a setting bed. Everything on this site is sand, had conditions been different we likely would have used more stone.
__________________
Forever a Hoosier flatlander
Reply With Quote
  #28  
Old 07-30-2010, 08:29 PM
danf danf is offline
 
Join Date: Apr 2009
Location: Moultonville/Center Ossipee, NH
Posts: 511
Default

Updated again. Not much left do on this project.

I suspect the fire pit is being used as I type this.
__________________
Forever a Hoosier flatlander
Reply With Quote
  #29  
Old 08-04-2010, 08:51 PM
danf danf is offline
 
Join Date: Apr 2009
Location: Moultonville/Center Ossipee, NH
Posts: 511
Default

Mark posted a finished picture of the fire pit today, as well as the granite counter top being set.

There's just a bit of cleanup work left on this one and we're done. As soon as we get a machine running again we can get that little bit finished.
__________________
Forever a Hoosier flatlander
Reply With Quote
Reply

Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 09:06 AM.


Powered by vBulletin® Version 3.8.5
Copyright ©2000 - 2010, Jelsoft Enterprises Ltd.
vBulletin 3 with Side Columns style provided by edgecutioner of Wrestlesomnia© Forums
©2007 ProHardscaper.com