mrusk
12-02-2007, 02:59 PM
In vegas, one guy was telling me how all his masonry decks/patios were structual. Says he does a permiter footing 42" below grade on every job.
Anyone have any construction details on how to do this?
Basicly, it eliminates the need for any expansion joints and it should never crack. The guy was getting 70-90 dollars a sq ft.
Anyone have any construction details on how to do this?
Basicly, it eliminates the need for any expansion joints and it should never crack. The guy was getting 70-90 dollars a sq ft.